Wednesday, December 11, 2019

Christmas and shots from the layout






Layout is coming along. Christmas is also coming along. Some more fine tuning on the bridge will be needed but trains will be running over it soon.

Monday, November 18, 2019

PG car cards and a few industries
















 We're almost ready to get the ops going. I added car card racks. designed and printed car cards and waybills, sorted and matched the car card to the actual cars rebuilt a few derelict cars. The two major projects left are to add the bridge over the doorway and construct the piers in Punta Gorda.


Thursday, June 27, 2019

Buildings are underway and 25 freight cars have been added to the fleet








25 weathered and properly weighted cars added to the fleet. Many covered hoppers and open hoppers for the phosphate fleet and box cars for general duty. The cars are shown in front of the town of Parsons in my Allegheny and Shenandoah Railroad.
Building construction has started. The three structures shown were all build from the same Lakeville Warehouse kit, What a great kit! It's modular so you can build it to serve either rail or trucks as you choose. The Publix warehouse structure was build with all the leftover parts from the first two false fronts.

Thursday, April 18, 2019

Punta Gorda and ALL TRACK is in and painted!!




The track is all in and even PAINTED. One of the great things about battery power is that the loco never stalls or jerks and YOU DON"T HAVE TO EVER CLEAN THE TRACK.
The first shot is of Arcadia now that all the track is in and the next three are of Punta Gorda with the barge unloading dock in the foreground and the car ferry to the rear.



These shots are overviews of the entire room showing all the trackwork and the beautiful painted rails.
I relocated all the equipment using the locomotive and the operation was flawless, no stalls. no jerks, and more importantly no derailments!! What a pleasure it was and also very satisfying:)
Alas it is time to pack the tools, vacuum the rug and depart for Spring in Maryland. See you in November we we start anew with the structures and the equipment. 

Tuesday, April 9, 2019

Arcadia Yard is nearing completion





I pride myself on my organization and planning. So when I started to enlarge the track plan to begin track laying in Arcadia I discovered a problem. THE DESIGN ASSUMED AN 10' peninsula and only the 8' ONE I BUILT WOULD FIT THE SPACE!!! Uh oh...... What a dufus!
Off to the design software. I'm now on the 5th or 6th redesign of the yard. The battery cars attached to the locomotives take up some room on the tail tracks so their length all had to be double and triple checked, i.e. revised, to be sure cars could be switched and run around moves could be accomplished. Originally the yard had a very linear design and now the the space required a compound track arrangement as shown in the photos. Now on to Punta Gorda that also had to be redesigned many times a also it occupies the now too short space.

Wye is installed, finally


After one false start that had to be removed, the wye is done. I mistakenly placed the two wye turnouts that are near the palms too close together resulting in sub-optimal radii on the yard approach end of the wye out the bottom pic to the lower left. All is well now and work has continued on Arcadia yard itself.

Thursday, March 28, 2019

Peninusla construction finished




Construction on the peninsula is finished. The black areas will be the water locations in Punta Gorda. I tried a new approach for the cork. Rubber cement works great. I installed the backdrop between the foam sections and just glued it in with foam glue. Now I am ready to install the wye leading into Arcadia and the yard tracks emanating from it.