Descriptions of the construction progress of my new Florida model railroad featuring the line from Lakeland to Punta Gorda. Originally a journal of RV trips throughout the United States and Canada with Patti and Bob. Also photo documentation of the progress on my Maryland model railroad, the Allegheny and Shenandoah, a mythical class one line connecting Strasburg VA. with Elkins WV.
Thursday, January 3, 2019
Cork is finito
The cork is finally all glued down. I used full strength white glue and push pins to keep it in place while the glue set. I still got some bulges where the cork swelled from the absorption of moisture from the glue but those can be dealt with as required by the track installation. The last photo is a tease for the track light phase. Drilling holes to mount the tracks is VERY VERY DAMN HARD. More later.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment